TPG’s network expansion capacity was handicapped by the power available to the tenancy at their inner city data centre
RESULT
We assessed the existing infrastructure then designed a solution to enable negotiations with the landlord to increase power capacity drawn from the existing main switchboard. The solution was implemented successfully while minimising outages to avoid network downtime